- Jan 2025 Site Assessment Complete
- May 2025 - Planning & Design Complete
- Sep 2025- Site Preparation
- Oct 2025 - Construction Begins
- May 2026 - Phase 1 Completion
- Aug 2026 - Construction Complete
- Dec 2026- Interior Finishing Complete // Staffing begins
- Jan 2027 - Equipment Installation Complete
- Feb 2027- Opening of Facility
Planning and design phase: During this phase, the hospital's design and layout will be planned, taking into account the specific needs and requirements of the local community. This will also involve obtaining any necessary regulatory approvals and permits.
Site preparation: This involves clearing the land, preparing the foundation, and installing basic infrastructure such as water and electricity.
Construction: The actual construction of the hospital will take place during this phase. This will involve building the walls, roof, and floors, installing windows and doors, and putting in place any necessary plumbing and electrical systems.
Interior finishing: Once the structure of the hospital is complete, the interior spaces will need to be finished. This includes installing flooring, painting walls, and installing fixtures and fittings.
Equipment installation: Once the interior finishing is complete, the hospital will need to be equipped with medical equipment and supplies, such as beds, operating tables, and medical devices.